Preliminary sampling has been done on the property, (results in chart below) with further sampling and mapping to be conducted in tandem with the Santo Domingo drilling program.
The Following Samples were taken of the property:
| Sample |
Location |
Type of Sample |
Au |
AG |
Cu |
Pb |
Zn |
| Number |
|
|
|
|
|
|
|
| 542513 |
Yesos (Santa Cruz) Vein end |
1 metre chip |
1.16 |
253 |
|
|
|
| 542514 |
El Salon Vein end |
1 metre chip |
0.38 |
189 |
|
|
|
| 542524 |
El Salon Vein (wall) |
1 metre chip |
<0.05 |
<5 |
|
|
|
| D-M-001 |
Los Yesos Dump |
Composite Chip |
6.56 |
142 |
0.01 |
0.12 |
0.13 |
| D-M-002 |
Los Yesos Dump |
Composite Chip |
4.24 |
365 |
0.01 |
0.08 |
0.17 |
| D-M-003 |
Los Angeles Dump |
Composite Chip |
7.92 |
541 |
0.03 |
0.08 |
0.13 |
| D-M-004 |
Guadalupe Dump |
Composite Chip |
7.10 |
4100 |
0.13 |
0.69 |
0.48 |
| D-M-005 |
Guadalupe NE end of Vein |
Chip across vein |
4.76 |
32 |
<0.01 |
0.01 |
0.02 |
The samples are subjected to full sample preparation followed by a 50g fire assay with a gravimetric finish. George Coburn P.Geo.,President and CEO of Stroud is the qualified person within the meaning of National Instrument 43-101 for the project and has verified the data contained in this news release, including sampling, analytical and test data. Analytical work was performed by ALS Chemex (ISO 9001 Certified Assayer).
|